ASME general of Inspection and test, ASME VIII 说不清楚 如何整改?
reportor: Great.wang T.R QCC spain
HOW TO IMPROVE ASME general of Inspection and test
Part1: UG 90
vendor qualification : 1) establishand keep QAQC system for ASME—subsection B of UG90, 2) get ASME U qualification certificate from ASME organization, 3)NB Ustamp for production: 1) vendor qualification; 2) inspector perform inspectionand test with witness point or review point: subsection B of UG90 inspector: from A.I, client or end user, TPA Inspection and test activity for inspector: subsection C of UG90 Part2: UW-46 CANCEL, or remove all relative of welding item from UG90 toWU-46. And remark welding head is required U stamp , while weldlesshead is not required U stamp. Part3: UCS-90 Cancel, or special remark inspection scope and attention inLTCS, HTAS
|