为啥里面的标号不是连续的?
A.14.2.1 In addition, representatives of the installing contractor,
insurance company, and owner should be present.
A.14.2.4 If a complete fire pump submittal package is available,
it should provide for comparison of the equipment specified.
Such a package should include an approved copy of the
fire pump room general arrangement drawings, including the
electrical layout, the layout of the pump and water source, the
layout of the pump room drainage details, the pump foundation
layout, and the mechanical layout for heat and ventilation.
A.14.2.6 The fire pump operation is as follows: |
|
|