[求助] SA-516补充要求如何理解?

  [复制链接]

TA在排名榜Top100

积分:暂未上榜

发帖:NO. 64 名

在线:暂未上榜

累计签到:665 天
连续签到:1 天
发表于 2017-4-26 17:29:08 | 显示全部楼层 |阅读模式
请教大神,SA-516补充要求S3和S4.1如何理解?如果S3是正常的力学,S4.1指的是什么?Z向性能还是高温拉伸?如何理解应用?谢谢

点评

你的见解太棒了: 2.5
cei
你的见解太棒了: 0
发表于 2017-6-2 22:20
你的见解太棒了: 5
  发表于 2017-5-17 10:13

评分1

查看全部评分1

米粒+5 理由

收起
shlsrgsbyxgs + 5 鼓励积极参与!

查看全部评分

"小礼物走一走,来ASME论坛支持我"
还没有人打赏,支持一下

TA在排名榜Top100

积分:NO. 2 名

发帖:NO. 7 名

在线:NO. 2 名

累计签到:3832 天
连续签到:1 天
发表于 2017-4-26 20:13:34 | 显示全部楼层
具体要求需要参见SA-20:
S3. Simulated Post-Weld Heat Treatment of Mechanical Test Coupons
S3.1 Prior to testing, the test coupons representing the plate for acceptance purposes for mechanical properties shall be thermally treated to simulate a post-weld heat treatment below the critical temperature (Ac3), using the heat treatment parameters (such as temperature range, time, and cooling rates) specified in the purchase order. For tests using specimens taken from such heat treated test coupons, the test results shall meet the requirements of the applicable product specification.

S4. Additional Tension Test
S4.1 Other Than Quenched-and-Tempered Plates - In addition to the required single tension test, a second tension test shall be made using a test specimen taken from a test coupon taken from a corner of the plate-as-rolled on the end opposite the single test specimen and in a direction parallel to the single test specimen. The results obtained using this second test specimen shall meet the requirements of the applicable product specification.


点评

你的见解太棒了: 5.0
你的见解太棒了: 5
  发表于 2017-5-17 10:14
hmk
你的见解太棒了: 5
  发表于 2017-4-27 08:09
你的见解太棒了: 5
  发表于 2017-4-27 08:03

评分1

查看全部评分1

米粒+10 理由

收起
smysmiley + 10

查看全部评分

"小礼物走一走,来ASME论坛支持我"
还没有人打赏,支持一下
回复 支持 3 反对 0

使用道具 举报

累计签到:43 天
连续签到:1 天
发表于 2017-5-4 12:58:59 | 显示全部楼层
1. S3是容器制造厂要求材料制造厂模拟容器制造过程中所有的热处理,对试样进行热处理,然后进行试验。实际材料的热处理在容器厂做,可以降低成本。比如买了个热轧状态的板,容器制造过程中要正火,让材料厂做好正火状态下的机械性能给你。
2. S4.1只是容器制造厂要求增加一副试样,按这天取样

点评

你的见解太棒了: 5.0 非常喜欢: 5.0
你的见解太棒了: 5 非常喜欢: 5
  发表于 2017-5-28 17:12
回复 支持 1 反对 0

使用道具 举报

TA在排名榜Top100

积分:NO. 52 名

发帖:NO. 29 名

在线:NO. 6 名

累计签到:2711 天
连续签到:2 天
发表于 2017-4-26 20:16:46 | 显示全部楼层
本帖最后由 lyklzy 于 2017-4-26 20:27 编辑

在 ASME BPVC. SECTION II.  PART A - 2015 中:                                                   
                                                   SA-516/SA-516M
SPECIFICATION FOR PRESSURE VESSEL PLATES, CARBON STEEL, FOR MODERATE- AND LOWER- TEMPERATURE SERVICE
                                             SUPPLEMENTARY REQUIREMENTS
Supplementary requirements shall not apply unless specified in the purchase order.
A list of standardized supplementary requirements for use at the option of the purchaser
is included in ASTM Specification A 20/A 20M. Those that are considered suitable for
use with this specification are listed below by title.

                                                       SA-20/SA-20M
Standard Specification for General Requirements for Steel Plates for Pressure Vessels

                                              SUPPLEMENTARY REQUIREMENTS
The following standardized supplementary requirements are for use if desired by the purchaser.
Those that are considered suitable for use with a product specification are listed in the product
specification. Other tests may be performed by agreement between the manufacturer or processor and
the purchaser. These supplementary requirements shall apply only if specified in the purchase order,
in which event the specified tests shall be made by the manufacturer or processor before shipment of the plates.


SA-20/SA-20M 是压力容器用钢板的总要求。他的管辖范围在 1. Scope ,SA-516/SA-516M 也在其中。所以,这两个标准必须要结合起来看,就容易理解了。
SA-516/SA-516M 里面的补充要求在 SA-20/SA-20M 里面都有详细说明。




点评

你的见解太棒了: 5.0
你的见解太棒了: 5
  发表于 2017-5-17 10:14
hmk
你的见解太棒了: 5
  发表于 2017-4-27 08:10
你的见解太棒了: 5
  发表于 2017-4-27 08:03

评分1

查看全部评分1

米粒+10 理由

收起
smysmiley + 10

查看全部评分

"小礼物走一走,来ASME论坛支持我"
还没有人打赏,支持一下
回复 支持 1 反对 0

使用道具 举报

TA在排名榜Top100

积分:NO. 52 名

发帖:NO. 29 名

在线:NO. 6 名

累计签到:2711 天
连续签到:2 天
发表于 2017-4-26 20:17:32 | 显示全部楼层
本帖最后由 lyklzy 于 2017-4-26 20:23 编辑

重复了,删除。


"小礼物走一走,来ASME论坛支持我"
还没有人打赏,支持一下
回复 支持 反对

使用道具 举报

TA在排名榜Top100

积分:NO. 175 名

发帖:NO. 9 名

在线:NO. 9 名

累计签到:2957 天
连续签到:169 天
发表于 2017-4-27 02:44:17 | 显示全部楼层
感谢各楼主的热心说明         
"小礼物走一走,来ASME论坛支持我"
还没有人打赏,支持一下
回复 支持 反对

使用道具 举报

TA在排名榜Top100

积分:暂未上榜

发帖:NO. 64 名

在线:NO. 9 名

累计签到:665 天
连续签到:1 天
 楼主| 发表于 2017-4-27 06:10:13 | 显示全部楼层
asnt2012 发表于 2017-4-26 20:13
具体要求需要参见SA-20:
S3. Simulated Post-Weld Heat Treatment of Mechanical Test Coupons
S3.1 Pri ...

非常感谢
"小礼物走一走,来ASME论坛支持我"
还没有人打赏,支持一下
回复 支持 反对

使用道具 举报

TA在排名榜Top100

积分:暂未上榜

发帖:NO. 64 名

在线:NO. 9 名

累计签到:665 天
连续签到:1 天
 楼主| 发表于 2017-4-27 06:11:03 | 显示全部楼层
lyklzy 发表于 2017-4-26 20:16
在 ASME BPVC. SECTION II.  PART A - 2015 中:                                                   
   ...

非常感谢
"小礼物走一走,来ASME论坛支持我"
还没有人打赏,支持一下
回复 支持 反对

使用道具 举报

TA在排名榜Top100

积分:暂未上榜

发帖:NO. 64 名

在线:NO. 9 名

累计签到:665 天
连续签到:1 天
 楼主| 发表于 2017-4-27 06:12:20 | 显示全部楼层
lyklzy 发表于 2017-4-26 20:17
重复了,删除。

谢谢,昨天这个事急需解决,谢谢大家
"小礼物走一走,来ASME论坛支持我"
还没有人打赏,支持一下
回复 支持 反对

使用道具 举报

TA在排名榜Top100

积分:NO. 26 名

发帖:NO. 2 名

在线:NO. 4 名

累计签到:3641 天
连续签到:2 天
发表于 2017-4-27 07:07:23 | 显示全部楼层
学习学习                                 
"小礼物走一走,来ASME论坛支持我"
还没有人打赏,支持一下
回复 支持 反对

使用道具 举报

累计签到:556 天
连续签到:1 天
发表于 2017-4-27 10:24:23 | 显示全部楼层
补充规定不是强制的!
当合同双方有要求的时候才会执行,前面的说的没错,sa20里面提到了这些内容,但是具体规定要执行补充规定,如果适用的话